top of page

Ken & Grace Lu, Foster City

Our clients in Foster City felt their existing carport was being underutilized. They came to us with several ideas and ultimately landed on the most practical choice for their family. The carport conversion into an ADU (accessory dwelling unit) provided more living space for the entire family and a future source of rental income. The conversion included our entire team, from our in-house architects, engineers, and designers to our subcontractors. The new ADU included all-new framing, new shear walls, a new sewer line, and plumbing for the bathroom and kitchenette. With a new electrical plan, our clients can rest assured there is ample power for their entire home. Other finishes included custom cabinets, new appliances, finished textured walls, windows, and GFCI outlets. Our team made sure everything was planned and built according to city code.       


Finishes/Hardware: Provided by the following showrooms -

https://www.tubz.net

http://www.baystonedepot.com

https://www.bedrosians.com

1_1ng.webp

Designing & Architectural planning

1_1ng.webp

ADU & Room Addition

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Architectural Review

Project Gallery

3_2.jpg

Complete Home Remodeling

3-6 months | $200k-$250k

San Jose

3_2.jpg

Kitchen and Bathroom

3 Months | $100k

San Francisco

3_2.jpg

Home Remodel and Addition

8 -10 months | 400k -500k

San Jose 2023

3_2.jpg

Kitchen Transformation

3 months | $60k-$80k

Morgan Hill

3_2.jpg

Kitchen and Bathroom Remodel

4-6 months | 70k - 90k

Los Gatos

3_2.jpg

Kitchen Remodeling

2-3 Months | 45-55K

Sunnyvale

3_2.jpg

Addition and Home Remodel

7-9 Months | $459K- $650K

San Jose

3_2.jpg

Bathroom Remodels

4-6 Weeks | $30k- $32k

Millbrae

3_2.jpg

Bathroom Remodel

4-7 weeks | $25K- $35K

San Jose

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Foster City

in

Garage conversion to ADU

3-4 months | $110K-$130K

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page