top of page

Morgan Hill

This kitchen remodel was designed to transform a once-isolated cooking space into a bright, open-concept area that seamlessly integrates with the rest of the home. By removing walls and reconfiguring the layout, the goal was to create a more inviting and functional environment that fosters connection, enhances natural light, and maximizes the flow between the kitchen, dining, and living areas.

The new open floor plan allows for unobstructed sightlines, making the kitchen the heart of the home.


A large central island serves as both a prep area and a gathering space, with ample seating that encourages family interaction and entertaining. The kitchen flows effortlessly into the dining and living areas, making it ideal for hosting guests.


The design also incorporates high-end materials, including sleek quartz countertops, modern stainless steel appliances, and a backsplash that adds a touch of personality. The choice of light, neutral tones throughout the space brightens the room and complements the natural light that now floods in from the living area.


Updated lighting features—including pendant lights over the island and recessed ceiling lights—create a welcoming ambiance, highlighting both workspaces and social areas. The remodeled kitchen is not just a place to cook, but a central hub where family and friends can gather, relax, and enjoy time together.


This open-concept remodel has completely redefined the kitchen, turning it into a versatile and dynamic space that enhances both the home's functionality and its overall aesthetic.


Finishes/Hardware:

https://www.bedrosians.com

https://www.kzkitchen.com

http://www.baystonedepot.com

1_1ng.webp

Kitchen Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Architectural Review

Project Gallery

3_2.jpg

Complete Home Remodeling

3-6 months | $200k-$250k

San Jose

3_2.jpg

Kitchen and Bathroom

3 Months | $100k

San Francisco

3_2.jpg

Home Remodel and Addition

8 -10 months | 400k -500k

San Jose 2023

3_2.jpg

Kitchen and Bathroom Remodel

4-6 months | 70k - 90k

Los Gatos

3_2.jpg

Kitchen Remodeling

2-3 Months | 45-55K

Sunnyvale

3_2.jpg

Addition and Home Remodel

7-9 Months | $459K- $650K

San Jose

3_2.jpg

Bathroom Remodels

4-6 Weeks | $30k- $32k

Millbrae

3_2.jpg

Bathroom Remodel

4-7 weeks | $25K- $35K

San Jose

3_2.jpg

Kitchen, Bathroom and Fireplace remodel

3 -3.5 months | 134k-150k

San Carlos

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Morgan Hill

in

Kitchen Transformation

3 months | $60k-$80k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page